The mesh is installed over the pan deck. The radiant heat tubes turn up where a manifold will be. The screed stakes are set, and we're waiting for the second floor concrete pour.
|
A brand new 6,000 sq.ft. steel framed designer's office. Steel frame, open web joists, and pan deck and concrete floors with radiant heat, clear anodized aluminum storefront, and pre-weathered galvalume siding.
|
||||||||||||||||
| |||||||||||||||||